Auckland Harbour Bridge
Peel Away 1 was used to remove lead paint on the northern side of the Auckland harbour bridge that connects the city to the north.
Location
Auckland, New Zealand
Project Type
Infrastructure/Bridge
Surface
Steel Structure
Products Used
Peel Away 1
Project Overview
This steel structure had thick layers of lead paint that needed to be safely removed. The challenge of working on such an iconic and vital piece of infrastructure required the highest standards of safety and containment.
Peel Away 1 was able to remove and fully contain all the waste safely and removed while the bridge was fully operational. This non-disruptive approach was critical to maintaining the bridge's daily traffic flow.
The successful completion of this project ensured the safe removal of hazardous lead paint while allowing this vital transportation link to remain fully functional throughout the entire process.